A heritage building that survived two fires and several development proposals. We replaced its sloped roof with synthetic slate, re-roofed the flat areas in Soprema modified bitumen, and clad the modern rear addition in zinc.
Once the city approved the final development proposal, Harrington and Associates contracted us to help restore the building. We replaced the entire sloped roof with synthetic slate tiles and a steel hip and ridge, and replaced all flat roofing with a Soprema 2-ply modified bitumen system.
We are also installing steel gutters and downpipes, along with zinc panels and a custom concealed zinc gutter system on the rear addition designed by E.R.A. Architects.
Scope of work
37 itemsSynthetic Slate Roof
Flat Roof
Rear Addition Roof and Cladding
Phase 2 Zinc Wall Assembly
Phase 2 Zinc Roof Assembly
Phase 2 Corrugated Wall Assembly
Phase 2 Guard Rail Flat Roof Fence
Phase 2 Flat Roof Assembly
In detail
424 Wellington Phase 2
Phase 2 is a modern addition with clean lines. We wrapped all the walls and roof, then insulated and clad them.
The work ran through the winter, which made it a challenge. Rheinzink can only be installed at +10 °C or warmer, or the material cracks, and zinc is very delicate. We built an enclosed, heated area around the building so the metal panels could be installed properly.
On site
ICI Roofing · Architectural Cladding · RestorationHave a roof, deck or wall assembly on the table?
Send us the drawings or the address. We will walk the assembly with you and come back with a scoped number.

