480 McLevin
We are completing a full roof replacement on a 10-storey condominium using a Soprema SBS modified bitumen roofing system.
To help maximize the condominium board's budget, we carefully removed, protected and reinstalled the existing XPS insulation and ballast wherever it remained in good condition. This reduced replacement costs and minimized construction waste.
The project also includes replacement of roof drains, new parapet coping, custom sheet metal flashings and a complete waterproofing upgrade. Combining technical expertise with value engineering, we are delivering a durable roofing system that extends the building's service life and saves the condominium corporation money.
Scope of work
6 itemsScope of work
On site
ICI Roofing · WaterproofingHave a roof, deck or wall assembly on the table?
Send us the drawings or the address. We will walk the assembly with you and come back with a scoped number.

