665 & 667 Yonge
A downtown roof replacement at 665 & 667 Yonge with extremely limited access. We installed a new SBS modified bitumen roof assembly while coordinating tight logistics around a busy laneway.
There was no available parking, and the rear laneway was constantly busy with deliveries to surrounding businesses, so logistics required careful coordination.
We couldn't leave a bin onsite, so we used a "load and go" system. A bin would arrive, we'd quickly load all debris, and it would be hauled directly to the dump. We repeated this several times to clear all waste.
Loading materials and equipment was equally difficult. To protect pedestrians at the front of the building, we built an overhead scaffold protection system as a precaution.
Scope of work
5 itemsNew roof